The coating process design of car plastic bumper
Time:2014-04-02 11:55:31

       The car bumper is the car important exterior decoration part, along with the car coating request unceasing enhancement, the bumper coating also more and more receives each specialized factory's attention. Car bumper mainly adopts plastic material, coating on the surface is difficult to attach, and low thermal deformation temperature of the plastic parts, generally in use in the production of paint drying temperature is lower than the drying temperature of the coating used of the metal, so the plastic coating and metal coating are quite different in process and coating materials, bumper painting with car coating commonly mixed production line. At present, some large domestic automobile manufacturers have taken the injection molding and painting of the bumper as an important part of vehicle production, and built the injection molding and painting workshop of the bumper when planning the new factory. For example, Toyota has built a resin workshop (namely the injection molding and painting workshop of the bumper and other plastic parts) in the domestic construction factory. The bumper of some automobile factories in China is provided by the large-scale professional plastic parts processing factory, and the large-scale automobile plastic parts production factories in China include Jiangyin molding and Shanghai Yanfeng Weistong, etc.

       The design of a number of bumper coating lines in China has absorbed the experience and technology of Japan, South Korea, Europe and The United States, etc. These coating lines have many different places in the process, equipment layout and mechanized form. In order to reduce the processing cost of plastic bumpers and improve their coating quality, a lot of researches have been made on coating materials, coating process and coating equipment, etc., and some achievements have been made. Therefore, the coating line design has undergone great changes in recent years.

1. Overall layout of coating line

       The overall arrangement of large coating lines tends to be regionalized and three-dimensional. The same or similar equipment and processes should be arranged in the same area as far as possible to facilitate the organization and management of production. The first floor is mainly equipped with the upper and lower parts (including the cache area), pre-treatment, polishing, inspection, decoration and auxiliary equipment; The second floor is mainly equipped with spray paint room and air conditioning platform area; The drying room is arranged on three floors. This three-dimensional arrangement of equipment is more conducive to improve the cleanliness of the spraying clean area, which is of great help to improve the qualification rate of the products off the production line at one time. The whole painting workshop is a fully enclosed workshop, which is manually operated on one side of the production line during upper and lower parts. The high-end bumper painting adopts automatic spraying, and the exhaust gas in the painting room is discharged after centralized high-altitude emission or centralized incineration. The paint supply system adopts the combination mode of centralized paint supply and small line system paint supply.

2 Coating materials

       Plastic bumper heat resistance is poor, when high temperature easy deformation, so the bumper coating generally cannot choose drying temperature is too high coating, drying temperature is about 80±5℃ and 120±5℃ for domestic paint. The bumper coating is composite coating namely primer + color paint + varnish, primer has two components and one component two, color paint mostly USES one component paint, varnish mostly USES two components paint. The two-component primer has a better covering force after baking, and can polish the surface particles and other paint defects, especially suitable for the appearance of the plastic parts are poor, but the two-component primer under the wet film state of electrical conductivity is generally poor, such as the primer is not dried spraying paint will affect the adhesion of color paint. Two - component varnish wide construction range, compared with one - component varnish, with less pollution, easy to adjust the advantages. The application of two-component primer and varnish system has disadvantages such as large equipment investment and complex maintenance of paint conveying pipeline, but the paint itself is easy to be adjusted, and it is easy to obtain a good surface condition of paint film.

3 Coating process

3.1 Main process forms of coating line

       There are several commonly used coating processes for plastic bumpers:

       Three spray and two drying (3C2B) process: top → pre-treatment → moisture drying → flame treatment → top masking → remove static electricity → primer spray → leveling → primer inspection/grinding → Remove static electricity → color paint spray → leveling → varnish spray → leveling → drying → strong cooling → inspection and modification → next parts → defective products repair;

Three spray and one drying (3C1B) top parts → pretreatment → moisture drying → flame treatment → top masking → remove static electricity → primer → leveling → paint spraying → leveling → varnish spraying → leveling → drying → strong cooling → inspection and modification → next parts → defective products repair;

       The 3C1B process can save the one-time investment of equipment and the operating cost of equipment in the later stage. The existing plastic bumper coating line with large production capacity in China adopts this process form and has been put into mass production with relatively stable operation.

3.2 prior to processing

       The pretreatment of the plastic bumper before painting is mainly to remove the dust, oil and residual release agent on the surface of the workpiece, and at the same time to activate the surface. Poor pretreatment can lead to poor adhesion, shrinkage cavity and particle defects. There are two forms of pretreatment, one is automatic spraying, the other is manual wiping. Automatic spraying is to hang the workpiece on the conveying equipment through the pretreatment spray line, the main process is: pre-degreasing → degreasing → washing 1→ washing 2→ fresh DI washing → water blowing → moisture drying → strong cold; Manual wipe is mainly used to wipe the whole workpiece surface manually with solvent, which can reduce the one-time investment of equipment and its operating cost. Domestic large quantities of plastic bumper coating line mostly adopts automatic spraying, small quantities of bumper coating and small parts coating mostly adopts manual wiping method.

3.3 Flame treatment

       The flame treatment further activates the workpiece surface. The robot jets flames to the surface of the workpiece. Manual and automatic electrostatic removal procedures are set after the flame treatment process to enhance the binding force between the workpiece and the coating film.

3.4 on the cover

       On the screen is mainly on the surface of the workpiece some do not need to be sprayed on the area to cover processing, the general line more difficult to cover, using more line shielding.

3.5 spray paint

       Workpiece spraying mostly adopts the combination of robot automatic spraying and artificial spraying, first automatic spraying, and then manual inspection of supplementary spraying. Some production lines can be completely automatic spraying after commissioning and enter into mass production. Automatic painting mainly adopts robot spraying. Generally, air spray gun is used for primer, cup rotary workstation + spray gun workstation is used for color paint and spray gun + cup workstation is used for varnish 2 workstations.

4 Coating equipment

       The equipment of plastic bumper coating line mainly includes mechanical conveying equipment, pretreatment equipment, flame treatment equipment, spray painting room equipment, drying furnace and artificial working area equipment, etc.

4.1 Mechanical conveying equipment

       Plastic bumper spraying line mechanized transport equipment in the form of more, there are general suspension transport chain, reverse cumulative chain and skid transport, friction transport form. Skid transport layout is flexible. In recent years, many production lines built in China have adopted skid transport. Japanese bumper coating line mainly adopts reverse cumulative chain and friction transport mode. Considering that some equipment of the pretreatment process conveying system has the requirements of waterproofing and anti-rot and the influence of drying process temperature, the driving device of the skid conveyor system in the general pretreatment and drying process adopts the external type.

4.2 Pre-processing equipment

       The pretreatment equipment mainly includes non-standard equipment, circulation system and exhaust system. The degreasing liquid of plastic bumper is slightly acidic (pH value is generally around 6.4), which is different from the degreasing liquid of car body, so the pre-treatment equipment should consider acid resistance, it is recommended that the pre-treatment closed chamber body and tank body adopt stainless steel material. The top of the pre-treatment equipment room is equipped with an exhaust fan to avoid the gas diffusion to the outside of the room. It is suggested that a maintenance platform, a maintenance door and a cantilever searchlight be installed on one side of the pre-treatment room to facilitate the maintenance and repair of the equipment.

4.3 spray room

       The existing domestic painting production line of the spray painting room has The Van Winkle spray painting room, the water spin spray painting room and the water curtain type spray painting room and so on, now USES the Van Winkle spray painting room. There are two kinds of air supply and exhaust system in spray chamber: fresh air and self-circulation air. The all-fresh air mode is that the air supply air conditioning unit in the spray chamber takes air from the outside of the chamber and sends it to the spray chamber after multi-stage treatment of the air conditioning unit. After the air is utilized in the spray chamber, the exhaust fan in the spray chamber is all discharged into the atmosphere. The self-circulation air mode is the air circulation utilization in the spray painting room (that is, the air enters the spray painting room through the air supply air conditioner, and then returns to the air supply air conditioner through the circulating air treatment equipment for reuse), the air in the spray painting room is not all discharged, only part of the discharge and part of the supplement. The amount of air supply and exhaust shall be calculated according to the balance of air flow in the spray chamber, the limit concentration of exhaust gas explosion in the spray chamber and the requirements of paint performance. Some production lines are designed to supplement the air flow with 10%, 30% of the total circulation air flow. The air volume of spray chamber exhaust and fill air should not be too low, too low will lead to the circulation of the wind organic solvent content is too high, easy to cause paint film surface gloss, and spray construction parameters control is more difficult. The concentration of exhaust gas in the spray chamber with circulating air is high (exceeding the requirements of national environmental protection standards), and the exhaust gas shall be incinerated back into the atmosphere (the exhaust gas after incineration can meet the national environmental protection requirements). The temperature of the painting room is generally required to be controlled at about 23℃, heat exchange in winter, refrigeration in summer, the use of fresh air coating production line energy consumption is large. The use of circulating air conditioning can reduce the energy consumption of production line (comprehensive energy consumption can be reduced by more than 30%, the installed power of related equipment can be reduced by 40%), and save the operating cost. Spray chamber adopts circulation air supply, corresponding spraying form should adopt automatic spraying, because the circulation air harmful gas content is high, not suitable for manual operation, such as artificial spraying should wear clothing and masks with anti-gas function.

4.4 drying furnace

       Baking furnace are mainly in the form of straight through, bridge and П type 3 kinds. The mechanical conveying of Japanese coating production line mostly adopts the form of reverse cumulative chain, and the drying furnace is the bridge drying furnace. Europe and the United States system using light skid transportation system, drying furnace for drying furnace П type. Double stroke drying oven is used to reduce heat dissipation area and energy consumption.

4.5 Paint supply system

       There are two paint systems, one is the centralized paint system, that is, all the paint is concentrated in a specific area for deployment, the centralized paint system to be arranged in the distance of three paint rooms near the place, to reduce the paint pipe passing long caused by the pressure loss and temperature loss, and avoid the pipeline cleaning difficulties; The other is the line edge system, that is, the paint transfer equipment is placed near the spray chamber. The volume of paint supplying tank used by the line-edge system is relatively concentrated, so the line-edge system is also known as the small system. The advantage of the small system is that it can meet the spraying production under the condition of small paint feeding. It can be used for infrequent production of color paint, new color trial production and temporary adjustment of color coating. A centralized paint system is used for primers, varnishes, and several high volume paints.

Service hotline

020-36860788

WeChat

Feedback

Feedback

日本香蕉网| 久久国产精品一区二区三区 | 交专区videossex农村 | 高清中文字幕在线a片 | 欧美日韩精品一二三区 | 欧美日韩人妻精品一区在线 | 国产欧美一区二区精品性色 | 一区二区三区免费观看视频 | 日韩av高清在线观看 | 色女人影院| 日韩欧美中文字幕一区 | 图片区小说区视频区 | 日韩av激情 | 97人人爽人人爽人人爽 | 国产免费一区二区三区免费视频 | 内射中出日韩无国产剧情 | 98av视频| 91久久国产综合久久91精品网站 | 四虎影库永久在线 | 日本激情网 | 天堂一区二区三区 | 成人免费黄色大片 | 日日操狠狠操 | 中文字幕一区二区av | 欧美极品视频 | 日韩午夜片 | 美女打屁股网站 | 欧美精品在线观看视频 | 在线观看毛片视频 | 视频一区二区三区四区五区 | 大学生gayxxxx男男超帅 | 黄色免费看片 | 亚洲一区二区三区四区在线 | 人妻少妇被猛烈进入中文字幕 | 午夜你懂的 | 九九热精品免费视频 | 狠狠操天天操 | 国产91在线 | 亚洲 | 日韩第1页 | 一本大道伊人av久久综合 | 亚洲夜夜夜| 97神马影院 | 婷婷四房| 制服.丝袜.亚洲.中文.综合 | 91视频日本 | 人人干干| 香蕉成视频人app下载安装 | 麻豆出品| 一区二区精品国产 | 女人16一毛片 | 黄色一级片免费看 | 青青操视频在线 | 丁香花电影在线观看免费高清 | 国产高清一二三区 | 丝袜导航 | 成人青青草 | jizz亚洲女人高潮大叫 | 成人av电影在线播放 | 久久久久久亚洲中文字幕无码 | 波多野一区二区 | 久久视频在线观看免费 | 91在线无精精品一区二区 | 国产精品入口麻豆 | 色肉色伦交av色肉色伦 | 亚洲一区二区日韩 | 哺乳期喷奶水丰满少妇 | 日本一级片在线播放 | 亚洲青草 | 久久国产区 | 精品无码人妻一区二区三区品 | 小嫩嫩精品导航 | 久久久久久久一区 | 99在线播放 | 亚洲你懂得 | 亚洲国产无码精品 | 无人在线观看高清视频 | 中文字幕码精品视频网站 | 四虎午夜影院 | 国产网站av | 香蕉网久久 | 青青在线视频 | 波多野结衣一区二区在线 | 久草免费在线色站 | 欧美熟妇毛茸茸 | 天天干天天操天天爽 | 欧美18免费视频 | 五月天视频 | 国产人妻人伦精品1国产 | 亚洲综合色一区 | 欧洲成人av | av超碰在线 | 欧美污网站 | 天天干天天上 | 热久久久久久 | 国产精品怡红院 | 亚洲网友自拍 | 国产精品123| 妹妹av| 欧美a视频| 91口爆一区二区三区在线 | 黄色网页在线播放 | 依人成人网| 91人人视频 | 亚洲污视频| 亚洲精品入口 | 专业操老外 | 蜜桃久久久久 | 日韩国产三级 | 精品国产一区二区三区性色av | 美女一级 | 一区三区视频 | 都市激情一区 | 禁欲天堂 | 九色国产精品 | 日本成人久久 | 懂色av蜜臀av粉嫩av分 | 日韩中文视频 | 青青草手机在线 | 奇米激情| 精品一区二区在线观看 | 日本一本在线 | 成人黄色免费在线观看 | 黄网站大全 | 波多野结衣三区 | 人人爱av | 真实人妻互换毛片视频 | 国产无码精品在线播放 | 日韩一二三区在线观看 | 日本成人免费在线 | 蜜桃av一区 | 性感美女在线观看 | 亚洲国产视频一区二区 | 精品久久久久久久久久久aⅴ | 国产精品呻吟 | 国产99久一区二区三区a片 | 爱情岛论坛永久入址测速 | 三级福利视频 | 免费成人深夜夜国外 | 欧美三区视频 | 国产91精品入口17c | 午夜免费福利电影 | 欧美专区一区 | 国产麻豆成人传媒免费观看 | 成人一级片在线观看 | 男女啪啪无遮挡 | 亚洲性图第一页 | 日本女人黄色 | 天天干天天看 | 精品久久久av | 久久噜噜| 性折磨bdsm欧美激情另类 | 一区二区在线免费观看 | 免费高清毛片 | 观看毛片| 成年人视频在线播放 | 亚洲自拍三区 | 极品少妇视频 | 在线观看av资源 | 插插看看| 老熟妇高潮一区二区高清视频 | 超碰在线99 | 女人的天堂网 | 久久com| 国产精品国产三级国产专区52 | 国产一区二区免费视频 | 亚洲色图清纯唯美 | 天海翼av在线 | 国产又粗又猛又色又 | 国产白浆在线 | 青青草自拍 | 性欧美bbw | 激情短视频 | 日本无翼乌邪恶大全彩h | 天天操天天操天天干 | 短裙公车被强好爽h吃奶视频 | 永久国产| 欧美精品第一页 | 男人的天堂2019 | 日韩精品成人免费观看视频 | 这里只有久久精品 | av美女网站 | 免费污网站在线观看 | 蜜桃成人在线视频 | 日韩高清不卡 | 99爱视频 | www.五月天婷婷 | 久久久久久九九九 | 五月婷婷狠狠 | 欧美性大战久久久久久久蜜桃 | 天堂中文 | 亚洲区自拍| 日本一区二区三区在线视频 | 奇米成人网 | 中文有码在线 | 福利片在线播放 | 久久午夜电影 | 欧美一级片免费看 | 日本成人社区 | 美国特色黄a大片 | av网在线观看 | 97色伦影院 | 99热国产精品 | 国产精品福利网站 | 国产5区| 国产精品美女久久久久 | 婷婷99| av第一区| a片在线免费观看 | 亚洲av无码国产精品久久不卡 | 日本毛片在线观看 | 99精品视频在线观看 | 高潮无码精品色欲av午夜福利 | 色妹妹在线 | 精品熟女一区二区三区 | 丰满少妇被猛烈 | 国产精品成人一区二区网站软件 | 伊人成长网 | 色网站免费 | 深夜福利院 | 女攻总攻大胸奶汁(高h) | 成年人性视频 | 一区两区小视频 | 一区二区三区中文字幕 | 最好看的2019免费观看 | 日本在线免费视频 | 牛牛视频在线观看 | 对白刺激国产子与伦 | 欧美午夜精品一区二区三区 | 欧美一级免费看 | 亚洲天天 | 久久99精品国产麻豆婷婷洗澡 | 三级a做爰全过程 | 日韩视频在线一区 | 午夜寂寞影院在线观看 | 国产精品17p | 性欧美高清 | 区一区二区三 | 日韩精品久久久久久久电影99爱 | 91在线不卡 | 浓精喷进老师黑色丝袜在线观看 | 日韩在线影院 | 可以免费看av的网站 | 亚洲高清免费视频 | 亚洲图片一区二区三区 | 欧美热热 | 免费观看毛片网站 | 九九精品九九 | www.精品国产 | 国产在线一 | 久久久18 | 亚洲av成人精品日韩在线播放 | 国产小毛片 | 和黑帮大佬的365 | 欧美伦乱| aaa级黄色片 | 香港无码 | 久久免费在线观看 | 欧州一级片 | 天天看天天做 | 在线免费一区 | 欧美电影一区二区三区 | 偷拍色图 | 国产精品欧美久久久久天天影视 | 精品国产一二三 | 天天干天天干天天干 | 欧美夜夜操| 中文字幕avav | 日韩美女一区二区三区 | 四虎在线网址 | 一区二区三区四区日韩 | 丰满人妻综合一区二区三区 | 青草一区 | 国偷自产视频一区二区久 | 狠狠综合网 | 国产精品18久久久 | 免费黄色小视频 | 欧美激情视频网站 | 欧美乱性| 男男gay做受xx | 一区二区三区在线免费观看视频 | 偷拍视频久久 | 永久精品 | 99在线视频免费 | 一边摸一边做爽的视频17国产 | 国产精品久久影院 | 三级成人 | 亚洲人在线观看 | 91av视频| 麻豆亚洲一区 | 免费av一区 | 精品人妻一区二区三区视频 | 国产午夜精品在线 | 精品麻豆视频 | 欧美第一页在线 | 久久香蕉影院 | 黑人精品欧美一区二区蜜桃 | 男女男精品视频 | 2018天天干天天操 | 小宝贝真紧h军人h | 黄页免费在线观看 | 激情四房| 全程偷拍露脸中年夫妇 | 丝袜美腿av | 亚洲精品aaaa | 亚洲免费婷婷 | 午夜av在线播放 | 国产在线观看免费网站 | 欧美人xxx | 亚洲免费高清 | 中文字幕在线天堂 | 国产xxx视频 | 鲁一鲁av| 黄网站免费在线观看 | 福利一区在线观看 | 亚洲自拍三区 | 粉嫩av一区二区夜夜嗨 | 丰满少妇被猛烈进入一区二区 | 一区二区三区影院 | 婷婷av在线| 中文字幕一二三四 | 日韩专区中文字幕 | 日本熟妇一区二区三区 | xxfree性黑人hd4k高清 | 婷婷综合亚洲 | 亚洲aa | 折磨小男生性器羞耻的故事 | 国产ts在线播放 | 欧美一级片网站 | aaa天堂 | 7799精品视频 | 欧美另类综合 | 成人免费午夜视频 | 搜查官av| 中文字幕高清在线 | 超碰网址 | 国产一区二区三区免费观看 | 久久久久久久国产 | 亚洲一区二区三区三州 | 日韩精品无码一区二区三区久久久 | 麻豆传媒网站 |