The coating process design of car plastic bumper
Time:2014-04-02 11:55:31

       The car bumper is the car important exterior decoration part, along with the car coating request unceasing enhancement, the bumper coating also more and more receives each specialized factory's attention. Car bumper mainly adopts plastic material, coating on the surface is difficult to attach, and low thermal deformation temperature of the plastic parts, generally in use in the production of paint drying temperature is lower than the drying temperature of the coating used of the metal, so the plastic coating and metal coating are quite different in process and coating materials, bumper painting with car coating commonly mixed production line. At present, some large domestic automobile manufacturers have taken the injection molding and painting of the bumper as an important part of vehicle production, and built the injection molding and painting workshop of the bumper when planning the new factory. For example, Toyota has built a resin workshop (namely the injection molding and painting workshop of the bumper and other plastic parts) in the domestic construction factory. The bumper of some automobile factories in China is provided by the large-scale professional plastic parts processing factory, and the large-scale automobile plastic parts production factories in China include Jiangyin molding and Shanghai Yanfeng Weistong, etc.

       The design of a number of bumper coating lines in China has absorbed the experience and technology of Japan, South Korea, Europe and The United States, etc. These coating lines have many different places in the process, equipment layout and mechanized form. In order to reduce the processing cost of plastic bumpers and improve their coating quality, a lot of researches have been made on coating materials, coating process and coating equipment, etc., and some achievements have been made. Therefore, the coating line design has undergone great changes in recent years.

1. Overall layout of coating line

       The overall arrangement of large coating lines tends to be regionalized and three-dimensional. The same or similar equipment and processes should be arranged in the same area as far as possible to facilitate the organization and management of production. The first floor is mainly equipped with the upper and lower parts (including the cache area), pre-treatment, polishing, inspection, decoration and auxiliary equipment; The second floor is mainly equipped with spray paint room and air conditioning platform area; The drying room is arranged on three floors. This three-dimensional arrangement of equipment is more conducive to improve the cleanliness of the spraying clean area, which is of great help to improve the qualification rate of the products off the production line at one time. The whole painting workshop is a fully enclosed workshop, which is manually operated on one side of the production line during upper and lower parts. The high-end bumper painting adopts automatic spraying, and the exhaust gas in the painting room is discharged after centralized high-altitude emission or centralized incineration. The paint supply system adopts the combination mode of centralized paint supply and small line system paint supply.

2 Coating materials

       Plastic bumper heat resistance is poor, when high temperature easy deformation, so the bumper coating generally cannot choose drying temperature is too high coating, drying temperature is about 80±5℃ and 120±5℃ for domestic paint. The bumper coating is composite coating namely primer + color paint + varnish, primer has two components and one component two, color paint mostly USES one component paint, varnish mostly USES two components paint. The two-component primer has a better covering force after baking, and can polish the surface particles and other paint defects, especially suitable for the appearance of the plastic parts are poor, but the two-component primer under the wet film state of electrical conductivity is generally poor, such as the primer is not dried spraying paint will affect the adhesion of color paint. Two - component varnish wide construction range, compared with one - component varnish, with less pollution, easy to adjust the advantages. The application of two-component primer and varnish system has disadvantages such as large equipment investment and complex maintenance of paint conveying pipeline, but the paint itself is easy to be adjusted, and it is easy to obtain a good surface condition of paint film.

3 Coating process

3.1 Main process forms of coating line

       There are several commonly used coating processes for plastic bumpers:

       Three spray and two drying (3C2B) process: top → pre-treatment → moisture drying → flame treatment → top masking → remove static electricity → primer spray → leveling → primer inspection/grinding → Remove static electricity → color paint spray → leveling → varnish spray → leveling → drying → strong cooling → inspection and modification → next parts → defective products repair;

Three spray and one drying (3C1B) top parts → pretreatment → moisture drying → flame treatment → top masking → remove static electricity → primer → leveling → paint spraying → leveling → varnish spraying → leveling → drying → strong cooling → inspection and modification → next parts → defective products repair;

       The 3C1B process can save the one-time investment of equipment and the operating cost of equipment in the later stage. The existing plastic bumper coating line with large production capacity in China adopts this process form and has been put into mass production with relatively stable operation.

3.2 prior to processing

       The pretreatment of the plastic bumper before painting is mainly to remove the dust, oil and residual release agent on the surface of the workpiece, and at the same time to activate the surface. Poor pretreatment can lead to poor adhesion, shrinkage cavity and particle defects. There are two forms of pretreatment, one is automatic spraying, the other is manual wiping. Automatic spraying is to hang the workpiece on the conveying equipment through the pretreatment spray line, the main process is: pre-degreasing → degreasing → washing 1→ washing 2→ fresh DI washing → water blowing → moisture drying → strong cold; Manual wipe is mainly used to wipe the whole workpiece surface manually with solvent, which can reduce the one-time investment of equipment and its operating cost. Domestic large quantities of plastic bumper coating line mostly adopts automatic spraying, small quantities of bumper coating and small parts coating mostly adopts manual wiping method.

3.3 Flame treatment

       The flame treatment further activates the workpiece surface. The robot jets flames to the surface of the workpiece. Manual and automatic electrostatic removal procedures are set after the flame treatment process to enhance the binding force between the workpiece and the coating film.

3.4 on the cover

       On the screen is mainly on the surface of the workpiece some do not need to be sprayed on the area to cover processing, the general line more difficult to cover, using more line shielding.

3.5 spray paint

       Workpiece spraying mostly adopts the combination of robot automatic spraying and artificial spraying, first automatic spraying, and then manual inspection of supplementary spraying. Some production lines can be completely automatic spraying after commissioning and enter into mass production. Automatic painting mainly adopts robot spraying. Generally, air spray gun is used for primer, cup rotary workstation + spray gun workstation is used for color paint and spray gun + cup workstation is used for varnish 2 workstations.

4 Coating equipment

       The equipment of plastic bumper coating line mainly includes mechanical conveying equipment, pretreatment equipment, flame treatment equipment, spray painting room equipment, drying furnace and artificial working area equipment, etc.

4.1 Mechanical conveying equipment

       Plastic bumper spraying line mechanized transport equipment in the form of more, there are general suspension transport chain, reverse cumulative chain and skid transport, friction transport form. Skid transport layout is flexible. In recent years, many production lines built in China have adopted skid transport. Japanese bumper coating line mainly adopts reverse cumulative chain and friction transport mode. Considering that some equipment of the pretreatment process conveying system has the requirements of waterproofing and anti-rot and the influence of drying process temperature, the driving device of the skid conveyor system in the general pretreatment and drying process adopts the external type.

4.2 Pre-processing equipment

       The pretreatment equipment mainly includes non-standard equipment, circulation system and exhaust system. The degreasing liquid of plastic bumper is slightly acidic (pH value is generally around 6.4), which is different from the degreasing liquid of car body, so the pre-treatment equipment should consider acid resistance, it is recommended that the pre-treatment closed chamber body and tank body adopt stainless steel material. The top of the pre-treatment equipment room is equipped with an exhaust fan to avoid the gas diffusion to the outside of the room. It is suggested that a maintenance platform, a maintenance door and a cantilever searchlight be installed on one side of the pre-treatment room to facilitate the maintenance and repair of the equipment.

4.3 spray room

       The existing domestic painting production line of the spray painting room has The Van Winkle spray painting room, the water spin spray painting room and the water curtain type spray painting room and so on, now USES the Van Winkle spray painting room. There are two kinds of air supply and exhaust system in spray chamber: fresh air and self-circulation air. The all-fresh air mode is that the air supply air conditioning unit in the spray chamber takes air from the outside of the chamber and sends it to the spray chamber after multi-stage treatment of the air conditioning unit. After the air is utilized in the spray chamber, the exhaust fan in the spray chamber is all discharged into the atmosphere. The self-circulation air mode is the air circulation utilization in the spray painting room (that is, the air enters the spray painting room through the air supply air conditioner, and then returns to the air supply air conditioner through the circulating air treatment equipment for reuse), the air in the spray painting room is not all discharged, only part of the discharge and part of the supplement. The amount of air supply and exhaust shall be calculated according to the balance of air flow in the spray chamber, the limit concentration of exhaust gas explosion in the spray chamber and the requirements of paint performance. Some production lines are designed to supplement the air flow with 10%, 30% of the total circulation air flow. The air volume of spray chamber exhaust and fill air should not be too low, too low will lead to the circulation of the wind organic solvent content is too high, easy to cause paint film surface gloss, and spray construction parameters control is more difficult. The concentration of exhaust gas in the spray chamber with circulating air is high (exceeding the requirements of national environmental protection standards), and the exhaust gas shall be incinerated back into the atmosphere (the exhaust gas after incineration can meet the national environmental protection requirements). The temperature of the painting room is generally required to be controlled at about 23℃, heat exchange in winter, refrigeration in summer, the use of fresh air coating production line energy consumption is large. The use of circulating air conditioning can reduce the energy consumption of production line (comprehensive energy consumption can be reduced by more than 30%, the installed power of related equipment can be reduced by 40%), and save the operating cost. Spray chamber adopts circulation air supply, corresponding spraying form should adopt automatic spraying, because the circulation air harmful gas content is high, not suitable for manual operation, such as artificial spraying should wear clothing and masks with anti-gas function.

4.4 drying furnace

       Baking furnace are mainly in the form of straight through, bridge and П type 3 kinds. The mechanical conveying of Japanese coating production line mostly adopts the form of reverse cumulative chain, and the drying furnace is the bridge drying furnace. Europe and the United States system using light skid transportation system, drying furnace for drying furnace П type. Double stroke drying oven is used to reduce heat dissipation area and energy consumption.

4.5 Paint supply system

       There are two paint systems, one is the centralized paint system, that is, all the paint is concentrated in a specific area for deployment, the centralized paint system to be arranged in the distance of three paint rooms near the place, to reduce the paint pipe passing long caused by the pressure loss and temperature loss, and avoid the pipeline cleaning difficulties; The other is the line edge system, that is, the paint transfer equipment is placed near the spray chamber. The volume of paint supplying tank used by the line-edge system is relatively concentrated, so the line-edge system is also known as the small system. The advantage of the small system is that it can meet the spraying production under the condition of small paint feeding. It can be used for infrequent production of color paint, new color trial production and temporary adjustment of color coating. A centralized paint system is used for primers, varnishes, and several high volume paints.

Service hotline

020-36860788

WeChat

Feedback

Feedback

日日干夜夜骑 | 超碰91人人 | 亚洲素人 | 精品久久在线 | 人人草在线观看 | 日韩视频h | 欧美黑人一级爽快片淫片高清 | 国产女人和拘做受视频免费 | 国产99久久久久 | 免费黄色看片网站 | 97超碰国产在线 | 婷婷激情网站 | 蜜臀精品一区二区三区 | 亚洲美女自拍 | 污污视频在线观看网站 | 国产成人在线网站 | 中文字幕在线观 | 久草网站 | 亚洲av人无码激艳猛片服务器 | 一级成人免费视频 | 丰满少妇被猛烈进入 | 成人免费网站 | 香蕉视频网页版 | 成人小视频在线免费观看 | 天堂一区二区三区 | 精彩久久 | 老女人性生活视频 | 日本三级吃奶头添泬无码苍井空 | 一本加勒比波多野结衣 | 黄色网战在线观看 | 日本美女性生活视频 | 尤物一区二区三区 | 九九在线免费视频 | 激情网站在线观看 | 国产乱码精品1区2区3区 | 精品国产乱码 | 国产成人在线精品 | 久久久久无码精品国产sm果冻 | 日韩一区二区三区在线观看 | 成人小视频在线 | 日韩美女视频 | 性xxxx视频播放免费 | 在线观看污 | 毛片动漫 | 国内自拍第一页 | 成人开心激情 | 欧美一级色片 | 日韩精品久久 | 日韩videos | 国产欧美一区二区三区在线看蜜臀 | 欧美日韩亚洲国产综合 | 国产美女免费观看 | 午夜一区二区三区在线观看 | 69天堂 | 日本精品视频在线播放 | 欧美影院 | 国产黄色小视频在线观看 | 国产又粗又长又大 | 欧美人与禽猛交乱配 | 欧美国产日韩一区二区三区 | 九七精品 | 在线播放日本 | 黄色三级三级 | 99热日韩| 久热精品视频在线观看 | 在线观看中文 | 打屁股无遮挡网站 | 国产一区二区视频免费观看 | 日韩三级网| 91亚洲欧美 | 欧美国产日本 | 久草视频免费在线 | 日本在线观看中文字幕 | 男人久久天堂 | 精品国产123| 成人在线观看网站 | 视频一区二区三区在线观看 | 国产日韩欧美视频 | 亚洲手机在线观看 | 久久爱成人| 亚洲精品3| 无码精品人妻一区二区三区影院 | 亚洲成年人av | 国产精品99久久久久久www | 巨物撞击尤物少妇呻吟 | 麻豆亚洲一区 | 亚洲一区二区三区在线看 | www国产亚洲精品久久网站 | 国产自产精品 | 婷婷操 | 亚洲一区二区三 | 欧美黄色一区二区三区 | 日韩成人综合网 | 嫩草社区| 很污的网站 | 国产在线中文 | 911香蕉视频| 国产成人无码www免费视频播放 | 国产一级片在线 | 亚洲网址在线观看 | 午夜视频免费看 | 人妻精品久久久久中文字幕 | 久久理论电影 | 色综合一区二区 | 毛片久久久 | 欧美日韩黄色片 | 久久久美女 | 和黑帮大佬的365 | 久久精品视频一区二区三区 | 国产精品videossex久久发布 | 欧美日韩综合视频 | 手机看片1024久久 | 四虎影院在线 | 午夜桃色| 日韩狠狠 | 国产激情自拍视频 | 亚洲高清在线 | 久草影视在线观看 | 搞黄网站在线观看 | 欧美国产日韩一区二区三区 | 密桃成熟时在线观看 | 久久久久久色 | 日本大尺度床戏揉捏胸 | 出轨同学会韩剧免费观歌在线观看 | 亚洲 欧美 中文字幕 | 亚洲中文字幕在线观看 | 日本高清www | 国产亚洲精品成人 | 蜜桃视频www | 一区二区三区高清 | 大桥未久在线 | 九九热视频精品 | 色中色综合 | 国产激情四射 | 91情侣视频| 国产又黄又粗 | 无套白嫩进入乌克兰美女 | 国产高潮流白浆喷水视频 | 天堂av在线免费观看 | 精品动漫一区二区三区的观看方式 | 欧美美女视频 | 国产精品蜜臀 | 激情伊人 | 亚洲国产日韩在线 | free性丰满69性欧美天美 | 中文字幕一区2区3区 | 天干夜天干天天天爽视频 | 日韩另类 | 亚洲一区在线视频观看 | 人人爽人人爽人人片av | 粉嫩av一区二区三区免费观看 | 女性裸体下面张开 | 性一交一乱一伦一色一情孩交 | 久久久久国产精品区片区无码 | 熟女少妇一区二区 | 另类一区二区 | 黄色一级视频网站 | 天天想你在线观看完整版高清 | 日韩一区二区三区在线观看 | 又黄又爽无遮挡 | 亚洲视频观看 | 亚洲区av| 欧美性免费| 黄色中文字幕 | 欧美性大战久久久久久久蜜桃 | 欧美日本国产 | 亚洲一区二区在线观看视频 | 久久久精品一区二区涩爱 | 亚洲免费网址 | 99国产精品久久久久久久久久久 | 大美女100%露出奶 | 99久久精品一区二区成人 | 老女人网站 | 国产精品理论在线观看 | 蜜桃视频在线入口www | www.com国产 | 欧美色欧美| yy6080午夜| 91中文字幕在线视频 | 国产又粗又猛又黄又爽无遮挡 | 国产男女无遮挡猛进猛出 | av基地网 | 亚洲精品无码久久久 | 色播网址 | 日韩欧美国产成人精品免费 | 亚洲福利视频一区 | 亚洲视频一区二区在线观看 | 久久精品国产99精品国产亚洲性色 | 日韩av成人网 | 噜噜噜久久,亚洲精品国产品 | 在线一区 | 看片国产 | 亚洲天堂偷拍 | 国产精品一区二区三 | 伊人影院99| 男人草女人| 欧美嫩草 | 中文字幕在线免费观看 | 俺也去婷婷 | 中文在线观看免费网站 | 国产精品综合久久 | 日本欧美久久久久免费播放网 | 日爽夜爽| 天天干夜夜欢 | 日本免费黄色网址 | 久久人人草| 激情在线视频 | 人人天天夜夜 | 国产乱国产乱老熟 | 你懂的网址在线 | a级黄毛片 | 久草视频资源 | 免费一级黄色片 | 成人午夜大片 | www.777奇米 | 国语对白少妇spa私密按摩 | 亚洲精品国产精品国自产观看 | 精品理论片 | 会喷水的亲姐姐 | 成人在线观看免费全集高清完整版 | 夜夜爱视频 | 91亚洲免费 | 内射干少妇亚洲69xxx | ass亚洲肉体欣赏pics | 91在线无精精品一区二区 | 男同毛片 | 国产一区二区三区在线观看视频 | 成人免费视频国产 | 亚洲九九九九 | 四虎4hu永久免费网站影院 | 91操操操| 国产黄色a| 日本二区 | 91精品国产aⅴ一区二区 | 黑人操亚洲女人 | 中文字幕无码人妻少妇免费 | 天天射天天舔 | 五月天久久久久 | 精品在线不卡 | 五月天激情四射 | 大桥未久恸哭の女教师 | 91成人免费版 | 国产黄色在线观看 | 青青草这里只有精品 | 久久午夜福利电影 | 国产性猛交╳xxx乱大交 | 在线看黄色片 | 精品视频一区二区在线观看 | 亚洲视频图片 | cao在线视频 | 蜜臀va | 中文字幕在线视频网 | 91青草视频 | 69日影院| 久久精品国产欧美亚洲人人爽 | 激情一级片| 波多野结衣视频在线观看 | 日韩免费看片 | 尤物av在线 | 亚洲图片欧美日韩 | 日本黄色大片网站 | 大香焦久久 | 国产伦精品一区二区三区视频黑人 | 色av一区 | 中文字幕1 | 在线观看中文 | 亚洲香蕉在线视频 | 欧美涩涩视频 | 日韩在线网址 | 久久一级片 | 精品国产乱码久久久久久牛牛 | 日韩少妇 | 乌克兰做爰xxxⅹ性视频 | 久久久久a| 国产视频二区三区 | 免费黄色大片网站 | 97精品在线视频 | 亚洲成人一区 | 欧美日韩一区二区三区四区五区六区 | 操操操综合网 | 91伦理视频 | 少妇人妻偷人精品一区二区 | 天使色吧 | 欧美高清视频 | 中文字幕第 | 深夜福利成人 | 人妻少妇被猛烈进入中文字幕 | 欧美精品在线一区 | 国产亚洲欧美一区二区 | 91国偷自产一区二区三区观看 | 巨茎大战刘亦菲 | 久久永久免费 | 偷拍青青草 | 在线视频a | 高潮流白浆在线观看 | 成人黄色视屏 | 国产精品视频在线免费观看 | 日韩美女在线 | 亚洲国产av一区二区 | 天堂中文在线免费观看 | 亚洲精品一区二区三区四区五区 | 麻豆黄网| 黄网站大全 | 日本成人高清 | 日韩av网页 | 毛片链接 | 亚洲色图1 | 97人人爽人人爽人人爽人人爽 | 黄色三级视频在线观看 | 亚洲成人精品一区二区三区 | 色女人影院 | 亚洲综合在线播放 | 中文字幕日本 | 中文久久字幕 | 亚洲精品国产suv一区 | 亚洲精品一区二区三区区别 | 91热热| 国产黄色影视 | 嫩草视频在线观看 | 日韩精品――色哟哟 | 国产精品99在线观看 | 欧美v亚洲| 中文在线永久免费观看 | 爱的色放在线 | 亚洲国产第一 | 日本一区二区在线观看视频 | 国产毛片久久 | 亚洲黄色免费电影 | 中文字幕丰满人伦在线 | 一区二区黄色 | 一级久久 | 欧美一线天 | 动漫美女被吸奶 | 波多野结衣视频在线观看 | 六月色播| 大尺度做爰呻吟舌吻网站 | 免费av地址 | 久草免费在线视频 | 欧美日韩中文字幕 | 黄色小网站入口 |